Current Projects

Cherry Orchard House, Marlborough

November 2017

Cherry Orchard House was built in 1971 as a care home and offices and it closed in January 2015.

Planning permission was obtained in March 2017 to convert the building into 15 No. flats and to construct 3 No. new two bedroom detached chalet bungalows.

Mayhew Callum Limited have been appointed by Jones Building Group to carry out the civil and structural engineering services including foundation design for the new build houses, structural requirements for the conversion, engineering layouts for the parking and hard landscaping, foul and surface water drainage design, attenuation details and the design of retaining structures.

Cherry Orchard House Proposed Elevations